PMP Design · NSW-Wide · DA & CC Ready

Pedestrian Management Plans (PMPs) for NSW Construction Sites

The plan councils want before they let the public past your site. Standalone PMPs and combined construction traffic & pedestrian management plans — prepared by PWZ-qualified designers across NSW, turned around fast.

AS 1742.3 Compliant
WHS Reg 2017 Aligned
Council & CC Ready
Beat Any Quote by 10%

What is a Pedestrian Management Plan?

A Pedestrian Management Plan (PMP) is a site-specific document setting out how pedestrians are kept safe and separated from vehicles, plant and hazards around a construction site or work zone. In NSW it's required either as a Development Application or Construction Certificate submission for medium-to-large developments, or under your Work Health and Safety Regulation 2017 duty to manage vehicle–pedestrian interaction. It covers footpath closures, protected walkways, detour routes, signage, hoarding and how foot traffic moves safely past the works.

On most NSW projects a PMP doesn't stand alone — it's bundled with construction traffic into a single Construction Traffic and Pedestrian Management Plan (CTPMP), the combined document councils like the City of Sydney, North Sydney and the Western Sydney LGAs commonly condition. MK prepares the PMP either way: as a standalone plan for footpath and pedestrian-only impacts, or as the pedestrian half of a full construction traffic and pedestrian management plan. We design to whichever your DA condition names.

When You Need a Pedestrian Management Plan

You need a PMP — standalone or combined with construction traffic — whenever your works put pedestrians near vehicles, plant or an obstructed footpath. The most common triggers in NSW:

  • Footpath closures or partial obstructions
  • Hoarding or scaffolding over a public path
  • Gantries and covered walkways (Class B hoarding)
  • Construction vehicles crossing a footpath to site
  • Sites fronting a school, station or busy retail strip
  • Crane lifts or material hoisting over pedestrian areas
  • Temporary pedestrian detours onto the road
  • High-foot-traffic CBD and town-centre developments
  • DA conditions naming a pedestrian management plan
  • A CTMP requiring a pedestrian sub-plan or section

Councils expect precise terminology — submitting a simple diagram when the condition asked for a pedestrian management plan can add weeks to approval. Send us your DA conditions or scope of works and we'll confirm exactly what you need within the hour, at no cost.

What's Included in MK's Pedestrian Management Plan

Every PMP we design is built to be approved first time — site-specific, not a template. We map how people actually move around your site, not just where a fence goes.

  • Pedestrian desire-line mappingThe routes people naturally take past the site, so safety measures aren't bypassed.
  • Protected walkway designTemporary footpaths, fenced corridors and covered walkways where the path is closed.
  • Detour & crossing routesAlternate pedestrian routes and temporary crossings clearly marked and signed.
  • Vehicle–pedestrian separationHow site vehicles and plant are kept clear of the public, per WHS Reg 2017.
  • AS 1742.3 compliant signageSign types, placement and advance warning to the Australian Standard.
  • Accessibility provisionsDDA-compliant widths, ramps and tactile considerations for the temporary route.
  • Hoarding & gantry interfaceHow Class A/B hoarding and scaffolding integrate with the pedestrian route.
  • TGS / TCP integrationPedestrian provisions tied to the work-zone scheme on the road side.
  • Site-specific risk assessmentHazards identified for the actual footpath and frontage, not a generic site.
  • PWZ-qualified preparationPrepared and signed by personnel holding current Work Zone Traffic Management qualifications.
  • Council-ready PDF formatFormatted to lodge via the NSW Planning Portal, your certifier or principal contractor.
  • Free minor revisionsSmall changes (timing, route, signage) at no extra cost.

Pedestrian Management Plan Cost in NSW

A standalone PMP in NSW typically runs from around $600 for a simple footpath impact up to $4,000+ when bundled into a full construction traffic and pedestrian management plan. Where MK sits by job type:

Standalone PMP
$600 – $1,500
Footpath closures, hoarding walkways and single-frontage pedestrian impacts.
Combined Traffic & Pedestrian
$1,500 – $3,000
Pedestrian plan delivered as part of a construction traffic management plan.
CBD / High-Foot-Traffic
$3,000 +
Town-centre, station-adjacent and school-frontage sites with complex detours.

Send us a written competitor quote and we'll beat it by 10%. No catch. Council lodgement fees, where they apply, are charged separately by your council.

How We Prepare Your PMP

Three steps from your enquiry to a council-ready PDF in your inbox.

Send Site Details

Email or call with the site address, frontage and footpath details, scope of works, hours, and any DA conditions or CC requirements. Site photos and architectural plans help but aren't essential.

We Design Your Plan

Our PWZ-qualified designers map pedestrian desire lines, design the protected route and detours, and draft your PMP against AS 1742.3 and your WHS Reg 2017 duties — standalone or built into your CTMP.

Receive & Submit

Council-ready PDF in your inbox, fast. Lodge it via the NSW Planning Portal, hand it to your certifier, or attach it to your construction traffic management plan. Minor revisions are free.

Where We Deliver Pedestrian Management Plans

We prepare PMPs for projects anywhere in New South Wales — with deep familiarity across the high-foot-traffic Sydney metro and Western Sydney councils that scrutinise pedestrian safety hardest.

Sydney Metro

Sydney CBD, North Sydney, Eastern Suburbs, Inner West, North Shore, Northern Beaches, St George, Sutherland Shire.

Western Sydney

Penrith, Liverpool, Blacktown, Parramatta, Cumberland, Camden, Campbelltown, Hawkesbury, The Hills, Wollondilly.

Central Coast & Hunter

Gosford, Wyong, Newcastle, Lake Macquarie, Maitland, Cessnock, Port Stephens.

Illawarra & South Coast

Wollongong, Shellharbour, Kiama, Shoalhaven, Eurobodalla, Bega Valley.

Regional NSW

Orange, Bathurst, Dubbo, Wagga Wagga, Albury, Tamworth, Coffs Harbour, Lismore.

Anywhere Else

If your project is in NSW, we can prepare your plan. Send us the location and we'll confirm same day.

"We're an architectural firm and have used MK Traffic a number of times now. Great documentation, great price, short turnarounds to meet our deadlines. A professional firm we're proud to keep using for all our projects." Elias S — Damour Design

Pedestrian Management Plan FAQs

Direct answers to what NSW developers, builders and project managers ask us most about PMPs.

What is a Pedestrian Management Plan?

A PMP is a site-specific document showing how pedestrians are kept safe and separated from vehicles, plant and hazards around a construction site. It covers footpath closures, protected walkways, detours, signage and hoarding. In NSW it's required as a DA or CC submission for larger developments, or under your WHS Regulation 2017 duty to manage vehicle–pedestrian interaction.

What's the difference between a PMP, a CTMP and a TGS?

A PMP governs pedestrian safety; a TGS (formerly TCP) is the work-zone diagram for vehicles and devices on the road; a CTMP is the umbrella plan for the whole build. On most NSW sites the PMP is folded into a combined Construction Traffic and Pedestrian Management Plan, or sits as the pedestrian section inside the CTMP. We design whichever your DA condition names.

Do I need a Pedestrian Management Plan for my DA in NSW?

If your works close or obstruct a footpath, run vehicles across a public path, or sit on a busy pedestrian frontage like a school or town centre, then almost always yes. It appears as a numbered condition on your Notice of Determination, often as part of a construction traffic and pedestrian management plan. Send us your consent wording and we'll confirm.

Is a PMP separate from a construction traffic management plan?

It can be either. For pedestrian-only impacts — a footpath closure or hoarding walkway — a standalone PMP is enough. For a full development, councils usually want the pedestrian plan combined with construction traffic into a single Construction Traffic and Pedestrian Management Plan (CTPMP). MK prepares it both ways, at no difference in process.

Who can prepare a Pedestrian Management Plan in NSW?

A PMP should be prepared by a suitably qualified traffic professional and signed by personnel holding a current Work Zone Traffic Management qualification (PWZ) from a SafeWork NSW-approved RTO. Where the plan ties into work-zone schemes, it must reference AS 1742.3. Every PMP MK prepares meets these requirements.

How much does a Pedestrian Management Plan cost in NSW?

A standalone PMP in NSW typically runs from around $600 for a simple footpath impact to $1,500 for a more complex frontage. Combined into a construction traffic and pedestrian management plan it sits from $1,500 to $3,000+, and CBD or school-frontage sites push higher again. Send us a written competitor quote and we'll beat it by 10%.

How long does a Pedestrian Management Plan take to prepare?

We can usually draft a standalone PMP within one to two business days of receiving your site details and plans. Combined construction traffic and pedestrian plans take a little longer. For urgent jobs, call us directly and we'll work to your deadline — most plans are turned around within hours to a couple of days.

Ready to get your PMP started?

Send us your site details and DA conditions and we'll quote within the hour — and confirm whether you need a standalone PMP or a combined construction traffic and pedestrian plan.

Request a PMP