Traffic Management Plans in Victoria — What You Need
Last updated 17/07/2026
A Traffic Management Plan (TMP) is the document Victorian councils and the Department of Transport and Planning assess before works affecting a road, footpath or nature strip can start. Standard TMPs with a Traffic Guidance Scheme start from $250 and are delivered the same business day when ordered before 11am; full construction traffic management plans start from around $1,500.
MK Traffic Management is a NSW-based plan design firm. We prepare Victorian traffic plans remotely — drawn to the Austroads Guide to Temporary Traffic Management (AGTTM), the Victorian Road Management Act 2004 Code of Practice for Worksite Safety and AS 1742.3:2019. Your accredited Victorian traffic crew implements the plan on site and lodges the permit. We design the document they work from.
In Victoria, any work that occupies or affects a public road, footpath or nature strip needs a documented traffic plan before it starts. On roads managed by DTP, that means a Memorandum of Authorisation (MoA) permit — and DTP enforces compliance with the current Code of Practice for every MoA application and its supporting documents, including traffic guidance schemes. On local roads, your council sets the requirement and issues the permit.
How We Work in Victoria
MK is a NSW-based design firm. For Victorian projects we do the drafting; your local accredited traffic management company handles the on-site work and the permit. It's a clean split — and it keeps your documentation fast, compliant and competitively priced.
The plan design
- Drafts your TMP and Traffic Guidance Scheme to AGTTM, the Victorian Code of Practice and AS 1742.3:2019
- Builds the risk assessment, device schedule, controller positioning and contingency arrangements the document needs
- Formats to what your council or DTP assesses against, so it reads the way the reviewer expects
- Delivers a lodgement-ready PDF — same day on standard plans ordered before 11am
- Handles revisions if the authority comes back with comments; minor changes are free
Implementation and lodgement
- Lodges the MoA permit application with DTP, or the works permit with your council
- Sets out signage and devices on the day, per the TGS we've drawn
- Provides the on-site accredited personnel Victoria requires for implementation
- Manages activations, deactivations and any compliance evidence the permit conditions call for
Why the split? Victoria accredits traffic management companies, not individual designers — and accreditation requires directly employing the personnel who do the work. Only accredited companies can work on DTP-managed roads or apply for DTP-issued MoA permits. MK isn't a Victorian accredited company and doesn't claim to be. We're the drafting service behind the crew you already use. If you don't have one yet, tell us and we'll point you at the DTP list.
TMP vs TGS vs CTMP in Victoria
Victoria uses different terms to NSW. A TMP is the project-level plan you lodge with a permit application. A TGS is the scaled worksite diagram inside it. A construction traffic management plan is the umbrella document a council conditions on a larger build. Most Victorian jobs need a TMP with at least one TGS; bigger builds need a construction plan on top.
| Traffic Management PlanTMP | Traffic Guidance SchemeTGS | Construction Traffic Management PlanCTMP | |
|---|---|---|---|
| What it is | Project-level plan defining how the worksite manages vehicles, pedestrians and cyclists | Scaled diagram of the worksite layout — signs, devices, controller positions | Umbrella document covering the full construction period of a development |
| Where it sits | Submitted with your permit application | Sits inside the TMP — one per work phase | Lodged with council, usually as a planning permit condition |
| Typical price | $250 – $600 | Included in the TMP | $1,500 – $8,000+ |
| Typical turnaround | Same day if before 11am | Same day if before 11am | 24 – 48 hours to draft |
| Who assesses it | DTP for state-managed roads, council for local roads | Assessed as part of the TMP | Council, as part of the planning permit process |
Prices are MK's design fee ranges and exclude council lodgement, MoA permit or road occupancy fees. "TCP" is a legacy term in Victoria — if your contractor asks for one, they mean a TGS. Send us a written competitor quote and we'll beat it by 10%.
Building in metropolitan Melbourne?
Melbourne councils run their own process — City of Melbourne assesses a Construction Traffic Impact Assessment (CTIA) rather than a standard CTMP, and the inner councils each have their own lodgement quirks. We've set out what those require on a dedicated page.
See Melbourne CTMP & CTIA requirements →What Your Victorian Plan Is Drawn To
Victorian traffic plans are assessed against three documents. Every plan we draft references all three — that's what makes it lodgement-ready rather than something the reviewer sends back.
The Austroads Guide to Temporary Traffic Management. Victoria adopted it into the Code of Practice on 01/12/2023, and DTP enforces compliance with it for MoA permit applications and supporting documents — including traffic guidance schemes.
The Road Management Act 2004 Code of Practice for Worksite Safety – Traffic Management. It incorporates AGTTM while retaining the Victorian-specific measures that preserve higher safety standards.
The national standard for traffic control at works on roads. Referenced by the Victorian Code of Practice, and the one part of the framework that's identical across every Australian state.
How to Get a Victorian Traffic Management Plan
Three steps, usually inside one business day for a standard plan.
Send Your Site Details
Email the site address, planning permit number, scope of works, project duration and approved working hours. We'll confirm what the authority needs and quote on the spot.
We Draft Your Plan
Your TMP and TGS drawn to AGTTM, the Victorian Code of Practice and AS 1742.3:2019 — risk assessment, device schedule, controller positioning and contingencies included.
Your Crew Lodges and Implements
You receive a lodgement-ready PDF. Your accredited Victorian traffic company submits the permit and sets out on the day. If the authority comes back with comments, we handle the revision.
Victorian Councils We Prepare Plans For
We prepare traffic plans for projects across metropolitan Melbourne and regional Victoria. Each council sets its own lodgement path and fee schedule — tell us which one your project sits in and we'll format to suit.
Victorian Traffic Management Plan FAQs
What Victorian builders and project managers ask us most.
What is a Traffic Management Plan in Victoria?
A TMP is the document defining how a Victorian worksite manages vehicles, pedestrians and cyclists. It's prepared to AS 1742.3:2019, the Austroads AGTTM and the Victorian Code of Practice for Worksite Safety, and it's what you submit with a permit application. Every TMP includes a risk assessment, a Traffic Guidance Scheme layout, device specifications, controller positioning and contingency arrangements.
What's the difference between a TMP and a TGS?
The TMP is the project-level document; the TGS is the scaled worksite diagram that sits inside it. A job with multiple work phases needs multiple TGS layouts within the one TMP. Victoria adopted "TGS" terminology with the move to AGTTM — if a contractor asks you for a "TCP", they mean a TGS.
Is MK accredited in Victoria?
No — and we're upfront about it. Victoria accredits traffic management companies rather than individual designers, and accreditation requires directly employing the personnel doing the work. MK is a NSW-based firm that drafts your plan remotely; your accredited Victorian traffic company implements it and lodges the permit. That's the model, and it's why our documentation is faster and cheaper than bundling design into a full-service contract.
Do I need a permit as well as a plan?
Almost always. On roads managed by the Department of Transport and Planning you need a Memorandum of Authorisation (MoA) permit, and DTP enforces compliance with the Code of Practice for every MoA application and its supporting documents. On local roads your council issues the permit. Your accredited Victorian crew lodges it — we supply the plan that goes with it.
How much does a traffic management plan cost in Victoria?
A standard TMP with a Traffic Guidance Scheme runs $250 to $600 depending on complexity. A full construction traffic management plan ranges from around $1,500 for a small residential build to $8,000+ for a complex commercial site. Those are design fees only — council lodgement and MoA permit fees are separate. Send us a written quote you've already received and we'll beat it by 10%.
How fast can you deliver a Victorian plan?
Same business day for standard TMPs and TGS layouts ordered before 11am. Construction traffic management plans and multi-stage projects usually take 24 to 48 hours to draft. Working remotely from NSW makes no difference to turnaround — everything is drawn from your site plans and permit conditions.
My project is in metropolitan Melbourne — is this the right page?
Melbourne councils have their own requirements, and City of Melbourne assesses a Construction Traffic Impact Assessment (CTIA) rather than a standard CTMP. We've set those out separately — see our Melbourne CTMP and CTIA page for what the inner councils assess against.