Greater Dandenong · TMP Design · VIC

Traffic Management Plans for the City of Greater Dandenong

AS 1742.3-compliant TMPs prepared for Greater Dandenong's Civil Works and Occupation of Road permits, and works across Dandenong, Springvale and the Dandenong South industrial precinct — formatted to lodge first time. From $1,500, and we'll beat any written quote by 10%.

AS 1742.3 Compliant
Road Management Act 2004
Prepared by Qualified Designers
Beat Any Quote by 10%

Updated 14/07/2026

Do I need a Traffic Management Plan for works in Greater Dandenong?

Yes. The City of Greater Dandenong states you “must obtain a Traffic Management Plan (TMP) and Traffic Guidance Scheme (TGS) if your works or event impacts vehicle or pedestrian traffic, including nature strip closure”. The TMP sits with a Civil Works Permit (for works on a footpath, nature strip, roadway or easement) or an Occupation of Road permit, and Council charges a fee, in line with the Road Management Act 2004, to assess TMPs and TGSs.

Greater Dandenong doesn't publish a fixed assessment turnaround for the permit itself, so plan conservatively — as a working guide, allow around two to three weeks for a straightforward job and longer near the Dandenong South freight network, and lodge early. Civil Works Permit applications are lodged through Council's online portal and need public liability cover. The usual cause of a bounced application is a plan that isn't drawn to AS 1742.3. MK builds your Greater Dandenong TMP to lodge cleanly the first time, in the terminology Council's assessors expect.

Greater Dandenong's three approval paths — and who signs off

“TMP approval” in Greater Dandenong isn't one stamp. Which path you're on decides your timeframe, so order the right document for the right authority.

PathWhat it coversWho approves & timing
Traffic Management Plan (TMP) & TGSMandatory where works or an event impact vehicle or pedestrian traffic, including a nature-strip closure. Council charges a fee to assess the TMP and TGS.Assessed by Council under the Road Management Act 2004, alongside your Civil Works or Occupation of Road permit. Must be prepared by a traffic consultant.
Civil Works / Occupation of Road permit (local road)Civil Works Permit for works on a footpath, nature strip, roadway or easement; Occupation of Road permit for occupying a road (generally a 24-hour period).City of Greater Dandenong under the Road Management Act 2004, Civil Works lodged via the online portal. Civil Works needs $10m public liability; Occupation of Road needs $20m.
DoT Victoria consent (arterial / freeway)Works affecting a State-declared arterial or freeway — EastLink, the Monash Freeway, Princes Highway, South Gippsland Highway/Freeway or the Dandenong Bypass.Department of Transport and Planning (DoT Victoria, formerly VicRoads) via a separate consent — not Council.

Not sure which path your site is on? Send us the address and your permit or planning conditions — we'll confirm whether it's a Greater Dandenong permit or a DoT Victoria consent, at no cost.

TMP, CTMP or CMP — which one does my Greater Dandenong project need?

Quick answer: in Victoria the road document is a TMP. “CTMP” is the New South Wales name for the same thing, and a CMP is a separate planning-permit document.

If your works are in Greater Dandenong, you need a Traffic Management Plan (TMP) — not a CTMP. “CTMP” (Construction Traffic Management Plan) and the phrase “construction traffic management plan” are New South Wales terms; Victoria prepares a TMP under the Road Management Act 2004 and AS 1742.3. A Construction Management Plan (CMP) is a different document again — a broader site-management plan often conditioned on a planning permit, and it doesn't replace the TMP that lets you occupy the road.

DocumentWhat it isWhen you need it
Traffic Management Plan (TMP)The Victorian road-works document — staging, road occupation, pedestrian safety and the TGS for each work zone, to AS 1742.3 and the Road Management Act 2004.Whenever you occupy or work in the road reserve. Goes with Greater Dandenong's Civil Works Permit.
Construction Management Plan (CMP)A broader site-management plan — construction hours, deliveries, parking, amenity and neighbour impacts. May reference traffic but isn't the road-occupation approval.Often a condition of your planning permit. Separate from the TMP, and sometimes required as well.
CTMP (a NSW term)The New South Wales name for a construction traffic management plan. Victoria doesn't use it.Never in Victoria. If a head office or interstate consultant asks for a “CTMP” on a Greater Dandenong site, that's your TMP.

Send us your permit or planning conditions and we'll tell you exactly which documents your Greater Dandenong project needs — the TMP, and whether a CMP is conditioned too — at no cost.

When Greater Dandenong requires a Traffic Management Plan

Greater Dandenong requires a TMP and TGS where works impact vehicle or pedestrian traffic. Common triggers across the LGA:

  • Civil Works Permits for footpath, nature strip, roadway or easement works
  • Occupation of Road permits for road occupation
  • Any works or event impacting vehicle or pedestrian traffic
  • Nature-strip closures during a build
  • Loading and unloading on a Council road
  • Crane lifts and concrete pumping over a public road
  • Works on or near State arterials and freeways (DoT Victoria consent)
  • Freight and heavy-vehicle works across the Dandenong South precinct
  • Utility works (water, gas, NBN, power) within the road reserve
  • Works in the Dandenong metropolitan activity centre

Not sure if your job needs one? Send us your permit conditions or scope of works — we'll confirm at no cost.

What's in a Greater Dandenong-ready TMP from MK

A TMP is a full technical document, not a sign diagram. Every plan we prepare for a Greater Dandenong site includes:

  • Construction staging & sequencingHow traffic, deliveries and works phase across the build to keep Greater Dandenong's road network moving.
  • Site access & haulage routesIngress, egress and heavy-vehicle routes mapped to suit the Dandenong South freight and industrial network.
  • Road occupation & loading layoutOn-street loading set out for a Civil Works or Occupation of Road permit where the site can't take deliveries internally.
  • Pedestrian & cyclist managementFootpath closures, detours and shared-path diversions drawn to AS 1742.3.
  • Supporting Traffic Guidance Schemes (TGS)Site-specific TGS for each work zone — exactly what Council requires alongside the TMP.
  • Risk assessmentHazards identified for the actual streets — not a generic template.
  • Road Management Act 2004 framingPrepared to the Victorian framework Greater Dandenong assesses against, with the terminology its officers expect.
  • Lodgement-ready formatStructured to attach to Council's online Civil Works Permit application.

Greater Dandenong TMP cost

A standard residential TMP for a Greater Dandenong site typically costs between $1,500 and $2,500. Our pricing by project complexity:

Standard Residential
$1,500 – $2,500
Single dwellings, dual occ and small builds with a straightforward road occupation.
Commercial / Multi-Stage
$2,500 – $5,000
Townhouses, infill and commercial builds with staging and ongoing deliveries.
Major / Industrial
$5,000+
Dandenong South freight, manufacturing and activity-centre projects with complex staging.

Send us a written competitor quote and we'll beat it by 10%. No catch. Council, permit and DoT Victoria fees are separate and paid directly to the authority.

How we get your Greater Dandenong TMP lodged

Three steps from enquiry to a lodgement-ready PDF — designed to get your document right first time so a busy assessing officer has no reason to bounce it.

Send Site Details

Email or call with the site address, scope of works, hours and any permit or planning conditions. Site photos help but aren't required.

We Design Your Plan

Our designers draft your TMP and supporting TGS in CAD, referenced to AS 1742.3 and the Road Management Act 2004, in the language Council's assessors expect.

Lodge & Apply

Signed PDF in your inbox, ready to attach to your Civil Works or Occupation of Road permit via Council's online portal, or DoT Victoria where a State road is involved.

Suburbs we prepare TMPs across in Greater Dandenong

We design TMPs for projects anywhere in the City of Greater Dandenong — the Dandenong activity centre, the Springvale corridor and the Dandenong South industrial precinct.

Dandenong Core

Dandenong, Dandenong North — the metropolitan activity centre and surrounds.

Dandenong South

Dandenong South — one of Victoria's largest industrial and freight precincts.

Springvale Corridor

Springvale, Springvale South — activity centre and established residential.

Noble Park

Noble Park, Noble Park North — established residential streets.

Keysborough

Keysborough, Keysborough South — residential growth and logistics.

Lyndhurst & Around

Lyndhurst and the surrounding industrial and residential edges.

Prepared to Victorian standards by MK Traffic Management

MK Traffic Management is a NSW-based traffic-plan firm preparing Victorian-compliant Traffic Management Plans remotely. Every TMP and TGS we produce for a Greater Dandenong site is drawn to AS 1742.3 and the Road Management Act 2004 framework, using the terminology DoT Victoria and Council assessors expect. We work from your site address, plans and permit conditions, so a clean, lodgement-ready document doesn't depend on us standing on the kerb.

"We're an architectural firm and have used MK Traffic a number of times now. Great documentation, great price, short turnarounds to meet our deadlines. A professional firm we're proud to keep using for all our projects." Elias S — Damour Design

Greater Dandenong TMP FAQs

Direct answers to what Greater Dandenong builders, developers and project managers ask us most.

Do I need a Traffic Management Plan for works in Greater Dandenong?

Yes. The City of Greater Dandenong states you must obtain a Traffic Management Plan (TMP) and Traffic Guidance Scheme (TGS) if your works or event impacts vehicle or pedestrian traffic, including a nature-strip closure. Council charges a fee, in line with the Road Management Act 2004, to assess TMPs and TGSs.

Which permit do I need — Civil Works or Occupation of Road?

It depends on the works. A Civil Works Permit covers works on a footpath, nature strip, roadway or easement. An Occupation of Road permit covers occupying a road, generally for a 24-hour period. Both sit under the Road Management Act 2004, and both need a TMP and TGS where traffic or pedestrians are affected. We confirm which one your job needs.

Do I lodge with Greater Dandenong or DoT Victoria?

It depends who manages the road. Works on local roads go to the City of Greater Dandenong via its Civil Works or Occupation of Road permits. Works affecting a State arterial or freeway — EastLink, the Monash Freeway, Princes Highway, South Gippsland Highway or the Dandenong Bypass — need a separate consent from DoT Victoria. We confirm the right authority for your site.

How much does a TMP cost for a Greater Dandenong project?

A standard residential TMP for a Greater Dandenong site costs between $1,500 and $2,500. Commercial and multi-stage projects range from $2,500 to $5,000, and major industrial or freight projects sit above $5,000. Pricing depends on staging, traffic volume and pedestrian impacts. Council and permit fees are separate. Send a written competitor quote and we'll beat it by 10%.

What does Greater Dandenong's Civil Works Permit require?

The Civil Works Permit covers works on a footpath, nature strip, roadway or easement and is lodged through Council's online portal. You'll generally need a site plan, public liability cover of $10 million, and — where traffic or pedestrians are affected — a TMP and TGS. Council charges a fee to assess the TMP and TGS under the Road Management Act 2004.

Who can prepare a TMP in Victoria?

A compliant TMP and its supporting Traffic Guidance Schemes should be prepared by a suitably qualified traffic consultant, working to AS 1742.3 and the Road Management Act 2004. Greater Dandenong requires both a TMP and a TGS where traffic is affected, so a plan prepared by a competent consultant is what gets you through — which is exactly what MK provides.

How fast can MK deliver a Greater Dandenong TMP?

Most TMPs are turned around within 24 to 48 hours of receiving your site details. Standard supporting TGS ordered before 11am can be same-day. Because Council doesn't publish a fixed permit turnaround, getting a clean, lodgement-ready plan early is the best way to protect your start date.

Can you prepare a Greater Dandenong TMP if you're based in NSW?

Yes. MK is a NSW-based firm preparing Victorian-compliant TMPs remotely, drawn to AS 1742.3 and the Road Management Act 2004 in the terminology Council's assessors expect. We work from your site address, plans and permit conditions — from the Dandenong activity centre to Springvale and the Dandenong South industrial precinct.

Is it a TMP or a CTMP in Greater Dandenong?

In Greater Dandenong — and everywhere in Victoria — it's a TMP (Traffic Management Plan). “CTMP” (Construction Traffic Management Plan) is the New South Wales term for the same road document; Victoria works to a TMP under the Road Management Act 2004 and AS 1742.3. If an interstate head office asks for a “CTMP”, on a Greater Dandenong site that's your TMP. A Construction Management Plan (CMP) is a separate planning-permit document and doesn't replace it.

Ready to get your Greater Dandenong TMP started?

Send us your site details and permit conditions — we'll quote within the hour and have a lodgement-ready plan to you fast.

Request a TMP