OPLINC Lodgement · ROL Service · NSW-Wide

OPLINC & Road Occupancy Licence Applications — We Lodge It For You

A Road Occupancy Licence is required for any work likely to impact traffic flow on a NSW State road — and it's lodged through Transport for NSW's OPLINC system. We prepare the compliant TGS, register and lodge through OPLINC, and manage the TMC review so your crew isn't stuck waiting on paperwork.

We Lodge Through OPLINC
Compliant TGS Included
TMC Review Managed
Beat Any Quote by 10%

What is OPLINC and a Road Occupancy Licence?

OPLINC (the Online PLanned INCident system) is the Transport for NSW portal used to apply for a Road Occupancy Licence (ROL) — a permit you must hold before any work that's likely to impact traffic flow on a NSW State or arterial road. Applications are lodged via OPLINC and assessed by the TfNSW Transport Management Centre (TMC), with new registrations and ROL applications processed within around 10 business days of submission.

Last updated 17/06/2026 · Source: Transport for NSW Road Occupancy Licences

A ROL covers the occupation of the road space only — it doesn't approve the physical works themselves, and it doesn't replace a CTMP or a council permit. To get one approved you need a compliant Traffic Guidance Scheme (TGS) showing the work zone, signage and devices to AS 1742.3 and the TfNSW Traffic Control at Work Sites (TCAWS) Technical Manual. That's the part most crews get stuck on — and the part we handle end-to-end.

OPLINC ROL vs Council ROL vs CTMP — Which Do You Actually Need?

This is where most projects trip up. There are two separate ROL regimes in NSW depending on who controls the road, and neither is the same as a CTMP. Get the wrong one and you face site shutdowns or fines that can exceed $2,200 a day.

State / Arterial Roads

TfNSW ROL via OPLINC

For work on a TfNSW classified (State) road, or any work within 100m of traffic signals regardless of who owns the road. Lodged through OPLINC, assessed by the TMC. This is the licence this page covers.

Local Roads

Council ROL

For work in a council-owned road reserve — local streets, footpaths, nature strips. Lodged via the relevant council's eServices, not OPLINC, with its own form, fees and TCP/TGS requirements.

Whole-of-Build

CTMP

The DA-condition document governing traffic across the entire construction period. A ROL is a short-duration occupation permit that sits underneath it — you can need both on the one project.

Many Sydney projects straddle both jurisdictions — a job that starts on a council footpath and extends into a State-managed clearway needs a council permit and a TfNSW ROL, aligned to the same dates. Send us the site address and scope and we'll confirm exactly which approvals apply — at no cost.

When You Need a Road Occupancy Licence

A ROL is required for any activity likely to impact traffic flow — even if the activity itself happens off-road. If your TGS shows any impact to a State road, a TfNSW ROL through OPLINC is almost always required. Common triggers:

  • Lane closures around a building or demolition site
  • Craning or oversize plant in and out of a worksite
  • Concrete pours, pump trucks and spoil cartage
  • Road maintenance — resurfacing, line marking, patching
  • Any work within 100m of traffic signals
  • Utility works — gas, water, power, telco in the road reserve
  • Hoarding erection or removal over the footpath
  • Detours pushing traffic onto a State or Regional road
  • Filming activities involving lane or road closures
  • Scaffold, skip bins or containers occupying road space

Restricted periods catch crews out

TfNSW enforces roadwork restriction periods across the network — generally around school holidays and public holidays — when no planned work is permitted on identified roads. The Sydney Metropolitan restrictions calendar is published yearly. Lodging early and around these blackout windows is exactly the kind of timing we manage for you.

What's Included in MK's OPLINC Lodgement Service

We don't just hand you a diagram and leave you to fight the portal. We run the whole ROL pathway — from the supporting TGS to the OPLINC submission to managing the TMC's review and any conditions that come back.

  • Compliant TGS designWork-zone Traffic Guidance Scheme to AS 1742.3 and the TfNSW TCAWS Technical Manual, site-stamped for your location.
  • OPLINC registration supportWe guide ACN/ABN registration or lodge under our own access so you're not blocked waiting on a business representative.
  • Full OPLINC lodgementWe complete and submit the ROL application through the OPLINC system on your behalf — correctly, first time.
  • TMC review managementWe track the application through the Transport Management Centre and respond to any requests so it doesn't stall.
  • Speed zone authorisationWhere your works need a temporary speed reduction, we flag and coordinate the authorisation alongside the ROL.
  • Restricted-period checkingWe check your dates against the current roadwork restriction calendar so you don't lodge into a blackout.
  • Portable VMS guidanceWhere VMS units are used, we ensure they meet TfNSW Transport Standard TS 00198 requirements.
  • Council coordinationIf your job also crosses a local road, we line up the council ROL so both approvals match dates.
  • Certificate of currency checkWe confirm the public liability cover the TMC and councils expect is in place before lodging.
  • Extensions & amendmentsNeed to extend or change dates? We manage the extension request before your licence lapses.
  • PWZ-qualified preparationEvery TGS is prepared by personnel holding current Work Zone Traffic Management qualifications.
  • NSW-wideSydney Metropolitan and regional ROLs across the whole State road network.

Why Builders Hand the OPLINC Process to Us

OPLINC isn't built for one-off applicants. The friction is real, and it's where projects lose days they didn't budget for.

Registration is a wall

If your ABN is already registered, you can't just sign up — you need an existing OPLINC business representative or the Network Access Coordination Unit to register you. We sidestep that delay entirely.

No ROL without a compliant TGS

The TMC won't issue a licence without a Traffic Guidance Scheme that meets the current TfNSW supplements and Australian Standards. A TGS missing site-specific stamping is a common rejection.

10 business days, if it's right

Standard ROL applications are processed within about 10 business days of submission — but only the clean ones. A knock-back resets the clock, so getting it correct the first time is the whole game.

No rights until it's in writing

No road occupancy rights exist until TfNSW issues written confirmation. Starting work on the strength of a lodged-but-unapproved application is a fast way to a stop-work order.

OPLINC / ROL Lodgement Service Cost

TfNSW doesn't charge a standard application fee for an ROL — our fee covers the compliant TGS, OPLINC registration and lodgement, and managing the TMC review. Estimated bands by job complexity:

Single Occupation
$1,800 – $3,500
One work zone, one TGS — a crane lift, single lane closure or short utility job on a State road.
Staged / Multi-Site
$3,500 – $7,000
Multiple TGS, staged occupations, or a job crossing both TfNSW and council jurisdictions.
Complex / Ongoing
$7,000+
Long-duration projects with repeat occupations, speed zone authorisations and rolling extensions.

All figures are estimates — your final quote depends on TGS count, duration and jurisdiction. Send us a written competitor quote and we'll beat it by 10%. TfNSW and council fees, where they apply, are separate.

How We Get Your ROL Approved

Three steps. You send the scope, we do the portal.

Send Us the Job

Give us the site address, the works, the dates and your traffic controller and insurance details. We confirm same day whether you need a TfNSW ROL, a council ROL, or both — and what the TGS has to show.

We Design & Lodge

Our PWZ-qualified designers prepare the site-specific TGS to AS 1742.3 and TCAWS, then register and lodge the ROL through OPLINC against your dates — checked against the restriction calendar first.

We Manage Approval

We track the application through the TMC, answer any queries, and send you the written confirmation once it's issued. Need an extension later? We handle that before the licence lapses.

OPLINC & Road Occupancy Licence FAQs

Straight answers to what NSW builders, traffic controllers and project managers ask us most about ROLs and OPLINC.

What is OPLINC?

OPLINC stands for the Online PLanned INCident system. It's the Transport for NSW online portal where registered users lodge applications for a Road Occupancy Licence on State and arterial roads. Applications are assessed by the TfNSW Transport Management Centre (TMC). It's separate from any council ROL system, which is used for local roads.

What is a Road Occupancy Licence (ROL)?

A ROL is a permit allowing you to occupy a specified road space at approved times, subject to conditions. It's required for any activity likely to impact traffic flow — even off-road work like craning over a footpath. Importantly, it covers the road occupation only; it doesn't approve the physical works, and it doesn't replace a CTMP or development consent.

Do I lodge my ROL through OPLINC or my council?

It depends on who controls the road. Work on a TfNSW classified (State) road — or within 100m of traffic signals on any road — goes through OPLINC to the TMC. Work in a local council road reserve goes through that council's own ROL system. Jobs crossing both need both approvals, aligned to the same dates. We confirm which applies before lodging.

How long does an OPLINC ROL take to approve?

TfNSW processes new registrations and ROL applications within around 10 business days of submission. That window only holds for clean applications — a knock-back for a non-compliant TGS or missing detail resets the clock. We lodge correctly the first time and manage the TMC review to keep it on track. Lodge early, especially around restriction periods.

Can I apply for a ROL myself?

You can, but OPLINC registration is a hurdle. If your ABN is already registered you need an existing business representative or the Network Access Coordination Unit to register you, and you can't lodge without a compliant Traffic Guidance Scheme. Most builders hand it to us so registration delays and TGS rejections don't cost them site days.

Do I need a TGS for my ROL application?

Yes. The TMC won't issue a ROL without a Traffic Guidance Scheme showing your work zone, signage and devices, prepared to AS 1742.3 and the TfNSW Traffic Control at Work Sites Technical Manual, and site-stamped for your location. The TGS is the supporting document the whole application hinges on — and it's included in our service.

How much does it cost to lodge a ROL?

TfNSW doesn't charge a standard application fee for a ROL itself. Our service fee — covering the compliant TGS, OPLINC registration and lodgement, and managing the TMC review — is estimated from around $1,800 for a single occupation up to $7,000+ for complex, long-duration jobs. Send us a written competitor quote and we'll beat it by 10%.

What are roadwork restriction periods?

TfNSW blocks planned work on identified roads during the busiest times — generally school holidays and public holidays. During these restricted periods, no planned occupation is permitted on the listed roads. The Sydney Metropolitan and regional calendars are published yearly. We check your dates against the current calendar before lodging so you don't get caught.

Is a ROL the same as a CTMP?

No. A CTMP is the DA-condition document governing traffic across the whole construction period, usually approved before your Construction Certificate. A ROL is a short-duration permit to occupy a specific stretch of road during specific works. On a single project you can need a CTMP, one or more ROLs, and the TGSs that support them — they work together, not instead of each other.

Can you extend an existing ROL?

Yes. ROLs are issued for set dates, and an extension request needs to be submitted before the current licence expires — councils typically want a couple of business days' notice, and TfNSW the same through OPLINC. If your scope or dates have changed materially, a fresh application may be needed instead. We manage extensions so your occupation doesn't lapse mid-job.

Need a Road Occupancy Licence sorted?

Send us the site address, scope and dates. We'll confirm whether you need an OPLINC ROL, a council ROL or both, design the TGS, and lodge it — so your crew isn't waiting on the portal.

Get Your ROL Lodged